In conjunction with installation of the AltaRocks seismic monitoring system, a sophisticated groundwater monitoring systemhas been installed including a vertical mile of repeatedly-tested steel casing and cement that isolates fluid injected into or produced from the geothermal well from the groundwater. The groundwater monitoring program plan will track local water resources before, during, and after the stimulation of the NWG 55-29 deep well, and involves taking water samples at strategic locations throughout the area. Our groundwater sampling procedures will provide the proof that our groundwater protection measures are effective. The groundwater monitoring program plan will track local water resources before, during, and after the stimulation of the NWG 55-29 deep well, and involves taking water samples at strategic locations throughout the area.
Tubing Suppliers
Please select a tubing supplier from the list below to learn more about that supplier and how to contact them.